Job completed for Mark B.

Completion date:

August 23, 2022

Location:

Purceville, VA

Why did the customer contact us?

Customer had bats.

Solutions provided:

Install critter guard around upper and lower edges of roof to close off gap between sub roofing and fascia. Installation of material will be installed to be less visible as possible.
Install 1/4 inch stainless steel down the entire length of upper ridge vent only to prevent bats from entering. Material will be installed to be less visible as possible.
Close small hole on edge of metal roof on rear of home.Install bay 1-ways as long days indicated by technician in the beginning of September to evict bats from attic.

Our Affiliates